unconstructed.ai
Print / PDF · Back to site

Sample · Day-0 Project Brief

Northside Community Wellness Center — Bid Set A

Generated example · Public training drawing set · Not a live project
Disciplines indexed: Architectural · Structural · Mechanical · Electrical · Plumbing

This is a sample of the Day-0 Project Brief estimators receive after a drawing set is ingested. Figures below are illustrative and cited to fictional sheet IDs for demonstration.
186
Sheets indexed
7
Missing / referenced sheets
12
Open clarifications
3
Spec vs drawing conflicts

Discipline sheet counts

DisciplineSheetsNotes
Architectural54Cover + code analysis present
Structural28Foundation schedule on S-101
Mechanical41Equipment schedule incomplete — see open Qs
Electrical36Panel schedules E-601–E-604
Plumbing22Riser diagrams P-301, P-302
Civil / Site5Referenced C-sheets not in this upload

Missing or externally referenced sheets

Open questions before pricing

Spec vs drawing conflicts

TopicSpec saysDrawings sayCitation
VAV box control BACnet / IP Legacy LonWorks callout 23 09 00 · M-601
Concrete strength (slabs) 4,000 psi 3,500 psi on S-001 general notes 03 30 00 · S-001
Emergency lighting runtime 90 minutes 60 minutes on E-001 26 52 00 · E-001

Self-perform vs. subcontract hints

Sample produced by unconstructed.ai · Cited evidence required · Suggest-only · Human review gates
unconstructed.ai · [email protected]